Asec Update – Apr 08, 2017
PSD version uploaded.
Click here for the Photosho (PSD) Version (24MB).
NSG Circular – JCIP 2017 – 4 – 007
CMC: NEW DESIGN FOR THE 2017 JCIP PROJECT TARPAULIN
To: 2017 JCIP National Board / 2017 LO Presidents
From: Office of the National Secretary General
Date: March 31, 2017 (Friday)

Greetings from JCI Philippines!
In line with the marketing and branding directives of the CMC, our team has finalized a new design for the 2017 project tarpaulin of JCI Philippines.

We do require all Local Organization to use the said project tarpaulin upon receipt of this circular.
To ensure that the Local Organization are in line with the directives of the Marketing & Branding department of our CMC, all projects done after April 15, 2017 should have the new tarp design and same should be included in the pictures required in the E-JCIPEA Project Completion Reports.
Below is the link for the new design of the 2017 JCIP project tarpaulin.
https://www.dropbox.com/sh/2v0gqwapxx01seu/AABT0VCzSlf1aobUqYmyk8JHa?dl=0
Please be guided accordingly.
RAYMOND SALAZAR (original signed)
2017 National Director – Committee on Media and Communications
JCI Philippines
MARK JOSEPH N. DAVID (original signed)
2017 National Secretary General
JCI Philippines
Approved By:
HEGEM C. FURIGAY (original signed)
2017 National President
JCI Philippines

Tarp Instructions
Click here for the Photosho (PSD) Version (24MB).
You must be logged in to post a comment.